The #NaveIndustrialRX (#RXFactory) project started with the operation of a radioactive source for the steel industry. Safety was the main concern of the client, not only because of the radioactive source but because of the building itself. The first and most important outline in design was choosing concrete as the main construction material. The whole building was modulated according to the metallic panels used to cast the concrete: factory’s floors and walls are constructed in multiples of 60cm leaving it exposed, which helped us to arrange the constructive and compositional elements of architecture.
© Camila Cossio
Architect: Emilio Alvarez Abouchard Arquitectura
Location: Morelia, Michoacán, Mexico
Architectural Design: Emilio Alvarez Abouchard
Area: 1860.0 m2
Project Year: 2018
Photographer: Camila Cossio
Collaborator: Estela Casillas
© Camila Cossio
Text description provided by the architects. The #NaveIndustrialRX (#RXFactory) project started with the operation of a radioactive source for the steel industry. Safety was the main concern of the client, not only because of the radioactive source but because of the building itself. The first and most important outline in design was choosing concrete as the main construction material. The whole building was modulated according to the metallic panels used to cast the concrete: factory’s floors and walls are constr...
© Camila Cossio
Architect: Emilio Alvarez Abouchard Arquitectura
Location: Morelia, Michoacán, Mexico
Architectural Design: Emilio Alvarez Abouchard
Area: 1860.0 m2
Project Year: 2018
Photographer: Camila Cossio
Collaborator: Estela Casillas
© Camila Cossio
Text description provided by the architects. The #NaveIndustrialRX (#RXFactory) project started with the operation of a radioactive source for the steel industry. Safety was the main concern of the client, not only because of the radioactive source but because of the building itself. The first and most important outline in design was choosing concrete as the main construction material. The whole building was modulated according to the metallic panels used to cast the concrete: factory’s floors and walls are constr...
-------------------------------- |
|