Knostrop Weir Foot & Cycle Bridge / Knight Architects
Knostrop Weir foot and cycle bridge forms part of the wider Leeds Flood Alleviation scheme. It will be a key link in maintaining a pedestrian and cycle pathway along the River Aire.
© Paul White
Architects: Knight Architects
Location: Knostrop, Leeds, United Kingdom
Lead Architects : Knight Architects
Main Contractor: Bam Nuttall
Structural Engineer: Mott MacDonald
Steelwork Contractor : SH Structures LTD
Project Year: 2017
Photographs: Paul White
© Paul White
Text description provided by the architects. Knostrop Weir foot and cycle bridge forms part of the wider Leeds Flood Alleviation scheme. It will be a key link in maintaining a pedestrian and cycle pathway along the River Aire.
© Paul White
The City Council?s requirement was for a 70m, foot and cycle bridge that had to be of high architectural quality. Construction of the bridge would also need to be tightly integrated with the construction of a new flood control weir it stands upon.
© Paul White
The project is a crossover point between two major projects in Leeds. Funding comes as part of the innovative £50M Leeds Flood Alleviation Scheme with the river link reinstating part of the newly upgraded Trans Pennine Trail. As such, special attention had to be made to the landscape assessments and guidance documents of the aforementioned schemes.
© Paul White
The superstructu...
© Paul White
Architects: Knight Architects
Location: Knostrop, Leeds, United Kingdom
Lead Architects : Knight Architects
Main Contractor: Bam Nuttall
Structural Engineer: Mott MacDonald
Steelwork Contractor : SH Structures LTD
Project Year: 2017
Photographs: Paul White
© Paul White
Text description provided by the architects. Knostrop Weir foot and cycle bridge forms part of the wider Leeds Flood Alleviation scheme. It will be a key link in maintaining a pedestrian and cycle pathway along the River Aire.
© Paul White
The City Council?s requirement was for a 70m, foot and cycle bridge that had to be of high architectural quality. Construction of the bridge would also need to be tightly integrated with the construction of a new flood control weir it stands upon.
© Paul White
The project is a crossover point between two major projects in Leeds. Funding comes as part of the innovative £50M Leeds Flood Alleviation Scheme with the river link reinstating part of the newly upgraded Trans Pennine Trail. As such, special attention had to be made to the landscape assessments and guidance documents of the aforementioned schemes.
© Paul White
The superstructu...
-------------------------------- |
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 03:55 - (
architecture )
Leça da Palmeira House by Raulino Silva
31-10-2024 03:55 - (
architecture )