Curved Girder Bridge Neckartenzlingen / Ingenieurbüro Miebach - interior design Blogs

Curved Girder Bridge Neckartenzlingen / Ingenieurbüro Miebach

With timber to new shoresWith a total length of 96.30 m, a three-field division proved to be a sensible system for the bridges. The Neckar is over spanned in middle of the building with 44.50 m, point symmetrical there is a foreland field with nearly 25.90 m length on each side. For reasons of manufacturability, a two-part cross-section was provided right at the beginning, which in the middle has sufficient space for cable runs.

© Burkhard Walther Architekturfotografie

Architects: Ingenieurbüro Miebach

Location: Neckartenzlingen, Germany

Area: 360.0 m2

Project Year: 2017

Photographs: Burkhard Walther Architekturfotografie

Infrastructure Planning: Ingenieurbüro Blankenhorn
Contractor Superstructure: Schaffitzel Holzindustrie GmbH +Co. KG

Contractor Abutment, Infrastructure: Gottlob Brodbeck GmbH +Co.KG

Client: Municipal Neckartenzlingen

© Burkhard Walther Architekturfotografie

With timber to new shores
With a total length of 96.30 m, a three-field division proved to be a sensible system for the bridges. The Neckar is over spanned in middle of the building with 44.50 m, point symmetrical there is a foreland field with nearly 25.90 m length on each side. For reasons of manufacturability, a two-part cross-section was provided right at the beginning, which in the middle has sufficient space for cable runs.

© Burkhard Walther Architekturfotografie

The co...
Source: Archdaily
URL: http://www.archdaily.com/

--------------------------------
 

Glass and Stone Oasis by Merle

21-09-2018 19:37 - ( architecture )


-------------------------------------