Variety Pack: The Master Bathroom.
Fact: a DIY'er is perpetually DIY'ing. As I suck at wrapping projects up too, the bits tend to linger. Please tell me I'm not alone... Regardless, here I was cornered into pulling together loose ends in the master bathroom involving the shower, floor, and toilet.
Last we left off in that master bathroom, I finally finished the shower. Fi. Nal. Lee. Oh wait, the last last we left off, I poured self-leveling concrete right over that icky tile floor.
But the main task was the shower. To see from the beginning, click here. If you're impatient and only want the final result, ok fine, you can click here.
Veering back to where I mentioned come back in the future and hear what went awry with the drain, we're now at that future present. If you remember, I used tile mortar to set the drain. Guess what" It didn't work.
Time undetermined later, weeks", I'm in said shower doing ya know shower things when I step on the drain and it moved. Yeah. Whoa. Bad.
After finishing shower things, I peek and discover the tile mortar was wet, not set, not solid...mushy. Ew. Bad. Even though it had set originally. Weird.
Soooo I pop over to Menards to find a drain fixing solution. Thankfully I was clean so talking to someone wasn't awkward. He said, "instant patching cement.* Sets fast, will fix your problem.&...
Source:
Flipping the Flip
URL:
http://humboldtartdept.blogspot.com
-------------------------------- |
|
Seven Hills SF: Feldman Architecture’s Airy Workspace Transformation
19-05-2024 05:12 - (
architecture )
Water’s Edge: Captivating Coastal Residence by SAOTA
19-05-2024 05:12 - (
architecture )