A Controversial Master Bath Project: Jet Tub Cover Up. Part II. Cedar!
Moving ahead with the controversial master bath project, jet tub cover up, onto part II here. Cedar! Kind of in a slight holding pattern as I sit here but, let's catch up regardless!
Because, as I mentioned last time, this has been a uh, how shall I say, a design on the fly adventure.
I'd designed and redesigned and redesigned and designed this space in my head sooo many times, the trash can in my brain is drowning in crumpled papers.
But I arrived upon this partial idea to work with, hoping the remaining pieces *waves hands around room* would fall into place around it. And they are.
Slowly.
Surely too slowly for Mike.
I've gotten the "when's the bathroom..." and the "maybe work on the bathroom....""'s here and there. I'm tryin' babe, I'm tryin'. That's the thing about home interiors, home decor, etcetera etcetera though. They take time. And taking time is a-okay. There's no need to ram through a design, clamor to get every last piece and part together a flurry. Taking time ensures you get it right.
Or, if you don't get it right, it's not the end of the world. Anything that can be done can be undone. And as I've said before, mistakes aren't mistakes, they're opportunities to learn.
In this case, as I go along, hitting the occasional trouble for not having a full-on plan, things shake out in ways that create other dilemmas so there's oodles of problem-solving happening to...
Source:
Flipping the Flip
URL:
http://humboldtartdept.blogspot.com
-------------------------------- |
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 03:55 - (
architecture )
Leça da Palmeira House by Raulino Silva
31-10-2024 03:55 - (
architecture )