Singapore International School of Bangkok - Phase II / Plan Architect
After the accomplishment of the first phase, Singapore International School of Bangkok requires an expansion for their secondary students. The initial requirement from the school was the auditorium building, including 400-seats multi-purpose hall along with a home for creative art center. Following with the secondary building that serves up to 750 students, two dormitory buildings for students, sport complex, 8-lanes swimming pool, and a football field that sit in the middle surrounded with all facilities.
© Panoramic Studio
Architects: Plan Architect
Location: Bangkok, Thailand
Area: 24461.0 m2
Project Year: 2016
Photographs: Panoramic Studio
Structural Engineer: ACTEC Co.
Mechanical Engineer : Plan Engineer Co.
Construction Management: Cornerstone Co.
Architect Team: Sinn Phonghanyudh, Wara Jithpratuck, Jittinun Krisnangkura, Paveen Rojchannavisart, Setha Saipipatpanit
Interior Designer: The Beaumont Partnership Co.
Landscape Designer: The Beaumont Partnership Co.
Contractors : Thai Nakano Co.
© Panoramic Studio
From the architect. After the accomplishment of the first phase, Singapore International School of Bangkok requires an expansion for their secondary students. The initial requirement from the school was the auditorium building, including 400-seats multi-purpose hall along with a home for creative art center. Following wi...
© Panoramic Studio
Architects: Plan Architect
Location: Bangkok, Thailand
Area: 24461.0 m2
Project Year: 2016
Photographs: Panoramic Studio
Structural Engineer: ACTEC Co.
Mechanical Engineer : Plan Engineer Co.
Construction Management: Cornerstone Co.
Architect Team: Sinn Phonghanyudh, Wara Jithpratuck, Jittinun Krisnangkura, Paveen Rojchannavisart, Setha Saipipatpanit
Interior Designer: The Beaumont Partnership Co.
Landscape Designer: The Beaumont Partnership Co.
Contractors : Thai Nakano Co.
© Panoramic Studio
From the architect. After the accomplishment of the first phase, Singapore International School of Bangkok requires an expansion for their secondary students. The initial requirement from the school was the auditorium building, including 400-seats multi-purpose hall along with a home for creative art center. Following wi...
| -------------------------------- |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 03:55 - (
architecture )
Leça da Palmeira House by Raulino Silva
31-10-2024 03:55 - (
architecture )
