Public Nursery in Glyfada / KLab architecture
The design and construction of public buildings in Greece is problematic, as the architect is not in charge of the construction. One of the biggest challenges of this project was to reintroduce the role of the architect as the essential contributor.
© Mariana Bisti
Architects: KLab architecture
Location: Glyfada, Greece
Principal Architect: Konstantinos Labrinopoulos
Project Architect: Veronika Vasileiou
Project Team: Myrto Lantza, Kelly Kagka
Area: 400.0 m2
Project Year: 2017
Photographs: Mariana Bisti
Project Managers: Future Constructions
Client: Municipality of Glyfada
© Mariana Bisti
From the architect. The design and construction of public buildings in Greece is problematic, as the architect is not in charge of the construction. One of the biggest challenges of this project was to reintroduce the role of the architect as the essential contributor.
© Mariana Bisti
Additionally, we intended to give prominence to the construction method of prefabrication. Prefabrication, one of the conditions of the competition also defined the final form of the building as the basic module would have to be transported on a truck.
Axonometric
The concept of the project was to design a building that would relate to the scale of its users while also introducing a new typology, that of the urban village. The main module draws inspiration f...
© Mariana Bisti
Architects: KLab architecture
Location: Glyfada, Greece
Principal Architect: Konstantinos Labrinopoulos
Project Architect: Veronika Vasileiou
Project Team: Myrto Lantza, Kelly Kagka
Area: 400.0 m2
Project Year: 2017
Photographs: Mariana Bisti
Project Managers: Future Constructions
Client: Municipality of Glyfada
© Mariana Bisti
From the architect. The design and construction of public buildings in Greece is problematic, as the architect is not in charge of the construction. One of the biggest challenges of this project was to reintroduce the role of the architect as the essential contributor.
© Mariana Bisti
Additionally, we intended to give prominence to the construction method of prefabrication. Prefabrication, one of the conditions of the competition also defined the final form of the building as the basic module would have to be transported on a truck.
Axonometric
The concept of the project was to design a building that would relate to the scale of its users while also introducing a new typology, that of the urban village. The main module draws inspiration f...
-------------------------------- |
|
Araz House: Pimodek’s Contemporary Redesign in Istanbul
01-05-2024 05:09 - (
architecture )
Water’s Edge Residence: Sustainable Design in Hot, Humid Texas Climate
01-05-2024 05:09 - (
architecture )