Neighborhood Center Refurbishment in Noallo de Abaixo / Muiños Otero López Arquitectura
Previous stageThe proposed action aims to recover the old unitary school as a neighborhood center of Noallo de Abaixo.
© Héctor Santos-Diez
Architects: Muiños Otero López Arquitectura
Location: Noallo de Abaixo _Castrelo de Miño_Ourense, Province of Ourense, Spain
Area: 75.25 m2
Project Year: 2016
Photographs: Héctor Santos-Diez
Promoter: Concello de Castrelo de Miño
Builder: ATCON S.L.
Project Manager: VÃctor Lorenzo Salgado
Metallic Constructions: CUESME
Lighting: Lledó
Electrical Installations: Suarez Electrical Installations
Milwork: Meijón e Hijos
Façade: FINSA
Budget: 49,997.00 ?
© Héctor Santos-Diez
Previous stage
The proposed action aims to recover the old unitary school as a neighborhood center of Noallo de Abaixo.When the previous building is in a situation of total ruin, with the structure about to collapse, the entire project is reformulated.
© Héctor Santos-Diez
On the ground floor a single polyvalent diaphanous room is organized, intended for various activities (lectures, workshops, meetings, meals, courses, etc). In addition to the main room, an area of trade and a toilet adapted to the disabled is defined. This interior area is complemented by the walkable roof as a garden.For access to the ground floor an exonartex is generated, partially covered, but open. It incorporates...
© Héctor Santos-Diez
Architects: Muiños Otero López Arquitectura
Location: Noallo de Abaixo _Castrelo de Miño_Ourense, Province of Ourense, Spain
Area: 75.25 m2
Project Year: 2016
Photographs: Héctor Santos-Diez
Promoter: Concello de Castrelo de Miño
Builder: ATCON S.L.
Project Manager: VÃctor Lorenzo Salgado
Metallic Constructions: CUESME
Lighting: Lledó
Electrical Installations: Suarez Electrical Installations
Milwork: Meijón e Hijos
Façade: FINSA
Budget: 49,997.00 ?
© Héctor Santos-Diez
Previous stage
The proposed action aims to recover the old unitary school as a neighborhood center of Noallo de Abaixo.When the previous building is in a situation of total ruin, with the structure about to collapse, the entire project is reformulated.
© Héctor Santos-Diez
On the ground floor a single polyvalent diaphanous room is organized, intended for various activities (lectures, workshops, meetings, meals, courses, etc). In addition to the main room, an area of trade and a toilet adapted to the disabled is defined. This interior area is complemented by the walkable roof as a garden.For access to the ground floor an exonartex is generated, partially covered, but open. It incorporates...
-------------------------------- |
|
Downside-up: Treviso Apartment Defies Gravity with Concrete Soffit
04-05-2024 05:26 - (
architecture )
White Stone House: Sculptural Seaside Sanctuary in Barcelona
04-05-2024 05:26 - (
architecture )