Erweiterung Primarschule Evilard / dolmus Architekten
The urban figure refers strongly to the existing complex. A two-storey building is placed on the back of the existing schoolhouse. It is connected to the school at the narrowest point. This creates an elongated court, which creates an atmospheric meeting, residence and communication space for the school.
© Bern & Aytac Pekdemir
Architects: dolmus Architekten
Location: Chemin des Voitats 4, 2533 Evilard, Switzerland
Lead Architects: Cédric von Däniken, Gani Turunc, Miriam Egger
Project Year: 2017
Photographs: Bern & Aytac Pekdemir, Rolf Siegenthaler
Collaborators: Bauleitung GmbH, Andreas Dürrhammer, Ländtestrasse 1, 2503 Biel
© Bern & Aytac Pekdemir
From the architect. The urban figure refers strongly to the existing complex. A two-storey building is placed on the back of the existing schoolhouse. It is connected to the school at the narrowest point. This creates an elongated court, which creates an atmospheric meeting, residence and communication space for the school.
Site plan
The old building remains visible and is formed together with the new building into a whole. The constant continuation of the roof design will be experienced as a unit throughout the school area.
© Rolf Siegenthaler
The new building is developed from the old building. Due to the given interior structure of the old building, three connection points are created. Thanks t...
© Bern & Aytac Pekdemir
Architects: dolmus Architekten
Location: Chemin des Voitats 4, 2533 Evilard, Switzerland
Lead Architects: Cédric von Däniken, Gani Turunc, Miriam Egger
Project Year: 2017
Photographs: Bern & Aytac Pekdemir, Rolf Siegenthaler
Collaborators: Bauleitung GmbH, Andreas Dürrhammer, Ländtestrasse 1, 2503 Biel
© Bern & Aytac Pekdemir
From the architect. The urban figure refers strongly to the existing complex. A two-storey building is placed on the back of the existing schoolhouse. It is connected to the school at the narrowest point. This creates an elongated court, which creates an atmospheric meeting, residence and communication space for the school.
Site plan
The old building remains visible and is formed together with the new building into a whole. The constant continuation of the roof design will be experienced as a unit throughout the school area.
© Rolf Siegenthaler
The new building is developed from the old building. Due to the given interior structure of the old building, three connection points are created. Thanks t...
-------------------------------- |
|
Green House: Aoc architekti’s Sustainable Design in Prague
05-05-2024 05:26 - (
architecture )
Embedded House: Organic Blending of Nature and Architecture
05-05-2024 05:26 - (
architecture )