Cremation Unit and Ashes Temple / Juan Felipe Uribe de Bedout + Mauricio Gaviria + Hector Mejía
The Project, in addition to solving the required brief, pretends to give order to the existing buildings through a circulation system and external pedestrians paths, with terraces and walkways which begin from the same Access to the Cemetery Park Campos de Paz.
© Federico Cairoli
Architects: Juan Felipe Uribe de Bedout, Mauricio Gaviria, Hector Mejía
Location: Medellin, Antioquia, Colombia
Architect In Charge: Juan Felipe Uribe de Bedout, Mauricio Gaviria, Hector Mejía
Area: 3474.0 m2
Project Year: 1998
Photographs: Federico Cairoli
© Federico Cairoli
From the architect. The Project, in addition to solving the required brief, pretends to give order to the existing buildings through a circulation system and external pedestrians paths, with terraces and walkways which begin from the same Access to the Cemetery Park Campos de Paz.
Site Plan
© Federico Cairoli
The Project consists of two components, which are clearly identified: the Cremation Unit set in front of the existent chapel?s atrium, and the Ashes Temple, lineal building, which crosses the site longitudinally.
Ground Floor Plan
The building?s floor plan responds to the particular conditions: The Chapel and atrium?s geometry, the site?s edge with its marked topography and row of trees, and to the existing mourning chambers.
© Federico Cairoli
The volumes assume a scul...
© Federico Cairoli
Architects: Juan Felipe Uribe de Bedout, Mauricio Gaviria, Hector Mejía
Location: Medellin, Antioquia, Colombia
Architect In Charge: Juan Felipe Uribe de Bedout, Mauricio Gaviria, Hector Mejía
Area: 3474.0 m2
Project Year: 1998
Photographs: Federico Cairoli
© Federico Cairoli
From the architect. The Project, in addition to solving the required brief, pretends to give order to the existing buildings through a circulation system and external pedestrians paths, with terraces and walkways which begin from the same Access to the Cemetery Park Campos de Paz.
Site Plan
© Federico Cairoli
The Project consists of two components, which are clearly identified: the Cremation Unit set in front of the existent chapel?s atrium, and the Ashes Temple, lineal building, which crosses the site longitudinally.
Ground Floor Plan
The building?s floor plan responds to the particular conditions: The Chapel and atrium?s geometry, the site?s edge with its marked topography and row of trees, and to the existing mourning chambers.
© Federico Cairoli
The volumes assume a scul...
| -------------------------------- |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 03:55 - (
architecture )
Leça da Palmeira House by Raulino Silva
31-10-2024 03:55 - (
architecture )
