751 Creative Industrial Office Design / hyperSity office
The office of 751D·park is located in the northeast of Beijing, which is transformed from adeclined gas plant built in 1954. The factory is one of the 175 focal state-owned industrial projectsimplemented in the socialist First Five-Year Schema.There was over 1/3gas supply delivered from this factory at that time. In the turn of the 21th Century, it became the agglomeration of creative industry in Beijing.
© hyperSity office
Architects: hyperSity office
Location: Chaoyang district, Beijing, China
Design Team: Yang Shi, Guoling Zhang
Area: 150.0 m2
Project Year: 2016
Photographs: hyperSity office
© hyperSity office
The office of 751D·park is located in the northeast of Beijing, which is transformed from adeclined gas plant built in 1954. The factory is one of the 175 focal state-owned industrial projectsimplemented in the socialist First Five-Year Schema.There was over 1/3gas supply delivered from this factory at that time. In the turn of the 21th Century, it became the agglomeration of creative industry in Beijing.
© hyperSity office
In an area of about 150 square meters, the new office is on the third level of a three-storey brick building, connected the footbridge system and the boiler area. Given the heritage protection policy that strictly prevents alterations of architectural appearance, the design ...
© hyperSity office
Architects: hyperSity office
Location: Chaoyang district, Beijing, China
Design Team: Yang Shi, Guoling Zhang
Area: 150.0 m2
Project Year: 2016
Photographs: hyperSity office
© hyperSity office
The office of 751D·park is located in the northeast of Beijing, which is transformed from adeclined gas plant built in 1954. The factory is one of the 175 focal state-owned industrial projectsimplemented in the socialist First Five-Year Schema.There was over 1/3gas supply delivered from this factory at that time. In the turn of the 21th Century, it became the agglomeration of creative industry in Beijing.
© hyperSity office
In an area of about 150 square meters, the new office is on the third level of a three-storey brick building, connected the footbridge system and the boiler area. Given the heritage protection policy that strictly prevents alterations of architectural appearance, the design ...
-------------------------------- |
|